Wheaton College (Traber Hall)

GT furnished and installed a complete HVAC renovation and upgrade to this dormitory for college students built in the 1970s. This project required GT to lead virtual design & construction (VDC) coordination meetings with other subcontractors and carry out a strategic and safe demolition of 7 floors of existing equipment in preparation for installation of a new DOAS unit, upgraded piping system for fan coil units in dorm rooms, both new hydronic heating & cooling systems, a mechanical room rehab, and more.

Project Stats & Highlights

  • Demolition & removal of absorption chiller, cooling tower, and all associated components

  • 7 floors of demolition & removal of FCUs, ductwork, air terminal equipment, and all other accessories

  • New two-pipe, dual temperature system serving 120 new FCU’s and interfaced with the new hydronic heating and cooling system

  • New hydronic heating & cooling system served by 4 pumps

  • 5 hot water unit heaters, 1 DOAS unit, 150 air terminal accessories

  • 3,500+ pounds of new ductwork installed

  • Converted existing air handling system to VAV operated system

  • Coordinated install of new DDC control system connecting new and existing systems together and within campus-wide network

  • Lead MEP coordination meetings using VDC and BIM technology