730 North Milwaukee Avenue

As a design-build project, GT engineered, furnished, and installed a complete system of heating, ventilation, and air conditioning in this 26-story, mid-rise building. As a multipurpose commercial building, this project required engineering considerations and many different types of equipment for installation to best fit the owner’s unique needs. Equipment ranged from a 2-cell galvanized steel cooling tower to a packaged air-cooled, gas-fired, VAV make-up air unit to 240 vertical stacked water source heat pumps and more. As proponents of the design-build process, we were able to confidently provide the most optimally functioning system for our customer within their budget.

Projects Stats & Highlights

  • Engineering team executed load calculations, equipment sizing, Chicago Energy Code analyses, 3D shop drawings, and more

  • 15+ uniquely purposed spaces within 26 floors to condition

  • 1 two-cell galvanized steel cooling tower, 3 gas-fired condensing boilers, 7 varying pumps with VFDs, and more

  • 260+ vertical stacked water source heat pumps and 215 ceiling-mounted exhaust fans

  • 2 full central toilet and dryer exhaust systems & 4 roof-mounted exhaust fans

  • 3 packaged, VAV RTU’s (make-up air & supply)

  • 17 electric or gas-fired unit heaters

  • 1 complete outdoor garage exhaust, heating, and CO2 detection system

  • MBE & WBE vendor and subcontractor participation